Photos and Special Projects

Pressure test and cool -down of upright cryogenic tank

High volume projects with 16,000 gallon queen tanks

Pipeline Projects

Self-Supported Nitogen Deliveries

Mini Tube Trailer -  12" line purge and 30 psig nitrogen pack

Mini Tube Trailer - 6 mile foam pig run and 20 psig nitrogen pack

Computer touch-screen controls

Pipeline Projects

Night Operations

Tight locations

Fig 1502 iron rigup with restraint system

Mini Tube Trailer - View of tubes and manifold

Liquids Terminals - tank and pipeline requirements

Liquids Terminals - tank and pipeline requirments

Liquid nitrogen deliveries to project sites

Pipeline cleaning with chemical slug.

Pigging runs

24/7 operating capability

Fig 1502 iron rigup

Pipeline Projects 

Hammer union hose to Fig 1502 iron rigup with dart style check valve, piped away blow down, and PRV directly on pipeline for maximum safety.

1/7

Copyright 2017 Chase Nitrogen Services